Decisions that matter

Thinking of Building in Perth? Here's How the Brick Shortage Affects You

Brick shortage blog 1
Brick shortage blog 6

If building a home in WA is somewhere on your list right now, there’s a factor worth understanding before you get further into the process. Western Australia’s brick supply is under real pressure. In September 2026, Midland Brick, the state’s only large-scale clay brick manufacturer, began rationing supply to builders, and it’s already affecting builds across the state. Here’s what that actually changes for you if you’re about to start.

 

What’s actually happening

HIA, Australia’s largest residential building association, confirmed in a member update on 14 September 2026 that it is working closely with Midland Brick and the WA Government to address the supply constraints affecting clay brick products across the state (source: HIA, WA brick supply update: what builders need to know).

 

The scale of it caught even the state government off guard. WA Deputy Premier Rita Saffioti said she was “shocked” by the information builders received when Midland Brick first notified them of the rationing (source: Business News WA).

 

Industry figures have gone further. Jason Janssen, chairman of the Home Builders Action Group, told 6PR that WA builders are facing at least a year of brick rationing, and that the disruption now extends beyond bricks to glass and laminate products too (source: 6PR).

 

Does this mean you shouldn’t build right now?

No. Homes are still being built across Perth every day, and this isn’t a reason to shelve your plans. It is a reason to ask a few sharper questions than you might have otherwise, before you choose a builder or a construction method, not after.

 

Why this is bigger than a normal supply hiccup

This isn’t the first time WA’s brick supply has been squeezed, and it’s structural, not a one-off, which is exactly why it’s worth factoring into your decision rather than waiting to see if it passes. Western Australia is the only state in the country where more than half of new detached homes are still built in double brick, a method most of the rest of Australia moved away from years ago. HIA WA executive director Michael McGowan has noted that timber-framed, steel-framed and modular construction methods now account for more than a quarter of the WA market, up sharply as builders look for options less exposed to a single supply chain (source: ABC News, Double brick dominates Perth homes. Experts say it could be slowing down construction).

 

The number of brick manufacturers operating in WA has also fallen sharply over the past decade, leaving Midland Brick as the state’s only supplier at scale. If you choose a brick build, you’re choosing a method with one supplier standing behind it. That’s the part worth weighing up front.

Brick shortage blog 3
Uplift dry season

What it means for your timeline if you choose brick

Most standard building contracts include extension of time provisions for genuine material shortages, meaning a delay caused by the current rationing is usually contractually allowed, not a breach the builder has to answer for. That’s often reasonable. It’s also cold comfort if you end up paying rent and a mortgage at the same time while your slab sits waiting on bricks that haven’t arrived.

 

The real cost isn’t just the wait. It’s that most contracts don’t attach any compensation to that wait, whatever’s causing it, so it’s worth knowing that going in, not discovering it partway through.

 

The uncertainty underneath all of this isn’t really about bricks. It’s about not knowing your actual completion date and price until well after you’ve already signed, and a shortage like this is exactly what exposes that gap.

 

Questions worth asking whichever builder you choose

Before you sign with anyone, it’s worth asking three things plainly:

  • How exposed would my build be to the current brick rationing, and has this builder confirmed their allocation actually covers new projects like mine?
  • If a material shortage delays my build, does anything in this contract compensate me for the wait, or do I simply absorb it?
  • Can this builder actually confirm my completion date and total price before I sign, or only once the build is already underway?

 

How Select First is built for exactly this

Every Select First home is timber framed, and it’s been that way from day one, not picked up in response to this year’s rationing. It’s a proven method used across WA for good reason. Timber is lightweight and easier to handle on tighter or rear-loaded blocks, keeps your home naturally comfortable thanks to its low thermal conductivity, and it’s a renewable material with a lighter footprint than steel. It also means faster enclosure and less weather-dependent building, so there’s less standing between signing and moving in.

 

As it happens, it also means your build draws on a broader base of suppliers than WA’s single-manufacturer brick market, so less of your timeline depends on one factory’s allocation decisions. That’s a bonus, not the reason we build this way.

 

Select First also backs every build with two guarantees, and both matter more than usual right now. Our Build Time Guarantee; if we miss your agreed completion date, for any reason, you’re paid $600 a week, every fortnight, uncapped, until you’re in. Plus, our Price Hold Guarantee; the price you agree to at your Home Ready Studio session is the price you build to, full stop. Two guarantees, one outcome: certainty, at a time when the rest of the market can’t offer you much of it.

 

The takeaway

If you’re thinking of building, this isn’t a reason to wait. It’s a reason to ask for certainty upfront, on your price, your timeline and your supply exposure, rather than discovering the gaps after you’ve already signed.

6 metre kitchen

Be first to try our new Home Ready Experience

Edge salt lake
Brick shortage blog 1
Brick shortage blog 3
Brick shortage blog 5
Balance Dry Season
Elevate Coastal White

Frequently asked questions

Should I delay building because of the WA brick shortage?

Not necessarily. Homes are still being built across Perth despite the current rationing. It’s a reason to ask sharper questions about your builder’s supply exposure and your contract’s protections before you sign, not a reason to put your plans on hold.

How does the brick shortage affect someone about to start building?

If you choose a brick build, confirm your builder’s allocation actually covers new projects and check what your contract does if a material shortage causes a delay. Most standard contracts allow the delay without requiring any compensation, so it’s worth knowing that upfront.

Is there a brick shortage in Perth right now?

Yes. In September 2026, Midland Brick, WA’s only large-scale clay brick manufacturer, began rationing supply to builders. HIA has confirmed it is working with Midland Brick and the WA Government to manage the supply constraints affecting clay brick products across the state.

How long is the WA brick shortage expected to last?

Industry figures, including Home Builders Action Group chairman Jason Janssen, have warned the rationing could run for at least a year. The exact timeline depends on how quickly supply is restored, so check current reporting for the latest status before relying on any specific date.

Does building timber frame avoid the brick shortage entirely?

Timber frame construction draws on a broader base of suppliers than WA’s brick market, which is concentrated around a single manufacturer. That doesn’t make timber immune to every supply pressure, but it does mean less of your build depends on one factory’s allocation decisions.

How does Select First protect me from delays caused by supply shortages like this?

Your completion date and total price are confirmed upfront at your Home Ready Studio session, before you sign. If we miss that agreed date for any reason, including a material shortage, you’re paid $600 a week, every fortnight, uncapped, until you’re in, and your Concierge keeps you updated the whole way through.

Contact Us

Fill out the form below and our team will get back to you shortly.