The price displayed on a new home in Perth is a starting point. For most buyers, it is not the number they pay at handover.
That is not a secret. It is, however, rarely explained clearly before a buyer signs a contract.
Understanding what is and is not included in a building quote is not optional reading for a first home buyer. It is the foundation of every other financial decision in the process.
Why display home prices in Perth don’t reflect final costs
A display home price is built to attract attention at a competitive number. It is structured to be legally defensible, not to reflect what a typical buyer will pay.
The most common items excluded from base prices include:
- Siteworks. The cost of preparing a block for construction depends on soil conditions, slope, and the presence of rock or fill. In Perth, reactive clay and limestone are common, both of which add cost. Siteworks are almost never included in a headline price and can range from $5,000 to $30,000 or more depending on the site.
- Retaining walls. Sloped or terraced lots require retaining to create a buildable area. This cost sits outside the build contract in most cases and is the buyer’s responsibility.
- Crossover and driveway. The connection from the road to the property, and the driveway itself, are typically excluded.
- Landscaping. Front and rear landscaping, including lawn, plants, paths, and garden beds, are not included in most building contracts.
- Fencing. Side and rear fencing is usually excluded unless explicitly itemised
- Window treatments. Blinds, curtains, and shutters are not included in standard building contracts.
- Letter box and clothesline. Minor but real additions that must be budgeted.
What are contract allowances and why do they matter
Contract allowances are fixed budget amounts set in the building contract for items that cannot be fully specified at signing. They represent what the builder expects you to spend on flooring, tiling, electrical fixtures, tapware, and appliances.
The problem is not that allowances exist. It is that they vary significantly between builders, and a lower allowance produces a lower headline price without reflecting lower cost.
A flooring allowance of $3,000 and one of $8,000 are not equivalent. One will require a significant top-up at prestart when the buyer selects floor coverings at actual retail prices. The other reflects what floor coverings actually cost.
When comparing quotes between builders, ask for the allowances section of each contract and assess them independently of the total price. The allowances will tell you more about the true cost of the build than the base price will.